Crowd-crush early warning
SAM 3.1 turns person tracks into people per square metre for each zone; Muse Spark watches the clip of every crowded spell.

Crowd early warning
SAM 3.1 counts. Muse Spark judges and plans. The Tier 1 model checks the frames. Voice Transcribe hears the announcements back. Every alert is chained.What the crowd watch proved
REPLAYrecorded 4 Nov 2026: A recorded run, replayed with no model calls8.2people/m²
33 people in the gate approach (2 x 2 m) at the peak, counted by SAM 3.1 on research footage (the Jülich bottleneck experiment).
critical Glimmer confirmed it on the frames (0.78).
Gate approach is 8.2 ppm2 with 33 people in 4 sqm and pressure 0.094, well into crush range. Side door B at 3.75 ppm2 and filling at +2.75 per min cannot take redirected flow, so inflow must be held instead.
Against the experiment's tracked heads: true peak 9.5 people/m², count ratio 0.996.
From the reading to a cleared gate
Reading: 8.2 people/m²
gate approach (2 x 2 m)
Muse Spark: critical
hold inflow at Outer queue barrier
stewards alerted
Glimmer confirmed; the alert is chained
safety officer alerted
safety officer: “On my way”
Staff seen at the gate (blue vest)
gate staff side
Cleared
The announcement, heard back
- Hindi
“Kripya dhyaan dein, apni jagah par rukein, aage dhakka na dein aur stewards ke nirdesh ka intezar karein.” - English
“Please wait where you are, do not push forward and follow stewards instructions.” Heard back by Muse Voice Transcribe.
One crush warning, step by step
REPLAYrecorded 4 Nov 2026: A recorded run, replayed with no model calls- Step 1, done:
Describe
Asked in Hindi: warn us before the crowd at the main gate turns dangerous; if it fills, turn the corridor toward side door B.
- Muse Spark 1.3
- Step 2, done:
Plan
Zones on the overhead view: gate approach (2 x 2 m), entry corridor; side door B as the other route.
- Muse Spark 1.3
- Step 3, done:
Prove
Counts checked against the experiment's tracked heads: ratio 0.996, off by 1.0 person on average.
- SAM 3.1counted heads
- Step 4, done:
Watch
Peak 8.2 people/m² at the gate approach (2 x 2 m), 33 people.
- SAM 3.1density
- Step 5, done:
Verify
Glimmer looked at the frames and agreed it was critical; the alert went out 41.1 s after the reading.
- Muse Spark 1.3judged25.8 s
- Muse Glimmer 30B
- Step 6, done:
Act
Hold inflow at Outer queue barrier; announced in Hindi and English and heard back; stewards and safety officer acknowledged.
- Muse Voice Transcribe
- Step 7, done:
Evidence
Chain intact, 9 records; alert hash b4893f2db6….
Connecting to the crowd watch…